Water Main Crane Base
One particularly interesting job that we have done was the crane bases for an 1100 tonne crane that had a lift of some 200 tonnes of a bridge span for a water main.
On establishment the crane company realized that the ground conditions were not suitable. A phone call to us very late one Thursday afternoon explained the problem and the urgency set the wheels in motion. Fortunately there was an extremely good geotechnical report available which indicated excellent founding material at 12 metres deep.