Powerhead in Action
1

An auger had to be used to pre-drill holes, as the ground contained several layers of different types of soil and the founding layer had to be reached before piles could be installed.
2

Positioning the auger
3

Pre-drilling
4

Reaching depth
5

Changing the drive tool over for pile installation
6

A smaller Excavator was used, with a pile grab tool to place the piles in the pre-drilled holes.
7

Positioning of pile
8

Excavator and Powerhead finding position over the pile
9

Position found
10

Installing the pile